|
Posted by:
Jeff Larson on
March 30, 2007 at
4:28PM EST
Due to reconstruction, the Congress Street Bridge over the Ft. Point Channel will be closed beginning on Monday, April 2 for about 4 months. Traffic Changes: - Sleeper Street - Between Seaport Boulevard and Congress Street, will be one-way southbound - Congress Street - Between Sleeper Street and A Street, will be one-way eastbound. - Traffic will be detoured using Seaport Boulevard and Summer Street - Detour routes will be posted.
|