Due to reconstruction, the Congress Street Bridge over the Ft. Point Channel will be closed beginning on Monday, April 2 for about 4 months.
Traffic Changes:
- Sleeper Street - Between Seaport Boulevard and Congress Street, will be one-way southbound
- Congress Street - Between Sleeper Street and A Street, will be one-way eastbound.
- Traffic will be detoured using Seaport Boulevard and Summer Street
- Detour routes will be posted.